Book a video call

Off-planLaunched January 2025

Mr C Residences Downtown

by Alta Real Estate Development in Al Wasl

From AED 8,100,00040/60 payment planHandover Q1 2027

From
AED 8,100,000
Handover
Q1 2027
Homes
2 to 4 bed
Sizes
2,345 to 5,614 sq ft
Payment plan
40/60
Built
73%

About Mr C Residences Downtown

Alta Real Estate Development builds Mr C Residences Downtown, a 71-storey tower in Al Wasl, Downtown Dubai. Apartments range from two to four bedrooms, between 2,345 and 5,614 square feet.

Apartments feature open-plan layouts with floor-to-ceiling windows and private balconies framing the city. Italian kitchens with modern appliances and smart home systems are fitted throughout. Arquitectonica designed the tower, realised through craftsmanship by 1508 London.

Dining options include restaurants, La Bottega Café, and a gourmet market on the premises. Recreation facilities encompass swimming pools, gymnasium, yoga room, cinema, and beach access. Residents enjoy butler service, concierge, housekeeping, 24-hour valet parking and security, a spa, health care centre, supermarket, and children's play areas.

Burj Khalifa and Dubai Mall are about 15 and 10 minutes away respectively. Dubai Opera, the Dubai Fountain, and Souk Al Bahar are approximately 15 to 20 minutes away. DIFC is five minutes away, and Dubai International Airport is about 10 minutes from the tower.

Homes

2 Bed Apartment

2,345 – 2,415 sq ft · from 3 baths

From AED 8,100,000

Mr C Residences Downtown: Floor plan Type 3, 2,345 sq ftMr C Residences Downtown: Floor plan Type 4, 2,384 sq ftMr C Residences Downtown: Floor plan Type 2, 2,398 sq ft
Reserve

3 Bed Apartment

3,069 – 3,211 sq ft · from 5 baths

From AED 12,000,000

Mr C Residences Downtown: Floor plan Type 1, 3,069 sq ftMr C Residences Downtown: Floor plan Type 3, 3,143 sq ftMr C Residences Downtown: Floor plan Type 2, 3,157 sq ft
Reserve

4 Bed Apartment

5,332 – 5,614 sq ft · from 6 baths

From AED 35,000,000

Mr C Residences Downtown: Floor plan Type 1, 5,332 sq ftMr C Residences Downtown: Floor plan Type 2, 5,614 sq ft
Reserve

Payment plan

  1. 40%During construction
  2. 60%On handover

Amenities

  • Swimming pool
  • Indoor pool
  • Beach access
  • Gym
  • Spa and wellness
  • Yoga and meditation
  • Children's play area
  • Landscaped gardens
  • Park
  • Cinema room
  • Restaurants and cafés
  • Shops
  • Supermarket
  • Clinic and pharmacy
  • 24-hour security
  • Concierge
  • Hotel services
  • Housekeeping

Construction and dates

73% built at the last site inspection, 4 August 2026.

Sales launched
30 January 2025
Planned handover
Q1 2027

Payments go into the project’s escrow account with Dubai Islamic Bank.

Location

  • DIFC5 min drive
  • Burj Khalifa15 min drive
  • Dubai International Airport10 min drive
  • Souk Al Bahar15 min drive
  • The Dubai Fountain15 min drive
  • The Dubai Mall10 min drive
  • Dubai Opera20 min drive

Open the location on a map →

About Al Wasl

Al Wasl is a residential neighborhood in central Dubai between Business Bay and Jumeirah, with apartments, duplexes, villas and penthouses.

Drive times from Mr C Residences Downtown: DIFC, 5 min drive; Burj Khalifa, 15 min drive; Dubai International Airport, 10 min drive; Souk Al Bahar, 15 min drive.

Mr C Residences Downtown is a freehold project.

New homes in Al Wasl →

Masterplan

Rooftop terraces, landscaped gardens, and parks are integrated throughout the development, creating outdoor recreational areas for residents. The grounds provide natural spaces within Downtown Dubai's urban environment.

Mr C Residences Downtown masterplan, Al Wasl

Brochure

Download the Mr C Residences Downtown brochure (PDF) →

Questions about Mr C Residences Downtown

What is the price of Mr C Residences Downtown?

Mr C Residences Downtown starts from AED 8,100,000, as of 22 September 2026. By home: 2 Bed Apartment from AED 8.1M; 3 Bed Apartment from AED 12M; 4 Bed Apartment from AED 35M.

Is Mr C Residences Downtown expensive for Al Wasl?

From AED 3,455 a square foot, against a median of AED 3,294 for 8 new projects in Al Wasl.

What is the payment plan for Mr C Residences Downtown?

The developer’s payment plan for Mr C Residences Downtown is 40/60: 40% during construction and 60% on handover, as of 11 October 2026.

When is Mr C Residences Downtown handed over?

Handover is planned for Q1 2027.

Are there floor plans for Mr C Residences Downtown?

Yes. The floor plans for 2 Bed Apartment, 3 Bed Apartment and 4 Bed Apartment are on this page under Homes.

About the developer

Alta Real Estate Development

4 projects selling in the UAE · founded 2020

About Alta Real Estate Development

Alta Real Estate Development, founded in 2020 and led by Abdulla Al Tayer, builds apartments, duplexes and penthouses across Al Wasl, Jumeirah Garden City, Jumeirah and Palm Jumeirah.

All 4 Alta Real Estate Development projects →

More in Al Wasl

Book a video call