Off-plan
Sawa phase 4
by Alef Group in Muwaileh
From AED 590,00040/60 payment planHandover Q4 2026
- From
- AED 590,000
- Handover
- Q4 2026
- Homes
- 1 to 3 bed
- Sizes
- 670 to 1,789 sq ft
- Payment plan
- 40/60
About Sawa phase 4
Sawa Phase 4 by Alef Group brings one, two and three-bedroom apartments to the ten-building Al Mamsha Seerah in Muwaileh, Sharjah.
Apartments measure 670, 1158 and 1789 square feet respectively. Contemporary design and international architectural standards are reflected throughout the units.
Residents have access to an indoor swimming pool, gymnasium, landscaped gardens, restaurants, a children's play area and a barbecue area. Vast green spaces and nature trails provide outdoor recreation. Sports facilities and CCTV security are included.
Sawa Phase 4 is located within Al Mamsha Seerah. Shopping, dining and entertainment options are integrated into the community, with major roads providing connectivity to surrounding areas.
Homes
Payment plan
- 10%Down payment
- 30%During construction
- 20%On handover
- 40%Post handover
Amenities
- Indoor pool
- Gym
- Children's play area
- Landscaped gardens
- Barbecue area
- Restaurants and cafés
- 24-hour security
Construction and dates
- Planned handover
- 30 December 2026
Location
About Muwaileh
Alef Group builds apartments in Muwaileh, a residential area of Sharjah.
Sawa phase 4 is a freehold project.
Masterplan
As one phase of the ten-building Al Mamsha Seerah, Sawa Phase 4 contributes to a masterplan blending modern architecture with natural landscapes. Green spaces, parks and nature trails balance built areas throughout the community.

Brochure
Questions about Sawa phase 4
- What is the price of Sawa phase 4?
Sawa phase 4 starts from AED 590,000, as of 24 September 2026.
- Is Sawa phase 4 expensive for Muwaileh?
From AED 881 a square foot, against a median of AED 1,189 for 21 new projects in Muwaileh.
- What is the payment plan for Sawa phase 4?
The developer’s payment plan for Sawa phase 4 is 40/60: 10% down payment, 30% during construction, 20% on handover and 40% post handover, as of 11 October 2026.
- When is Sawa phase 4 handed over?
Handover is planned for Q4 2026.
- Are there floor plans for Sawa phase 4?
Yes. The floor plans for 1 Bed Apartment, 2 Bed Apartment and 3 Bed Apartment are on this page under Homes.
About Alef Group
Alef Group, established in 2013, develops homes in Sharjah. The company builds apartments, villas, townhouses and penthouses in areas including Muwaileh, Hayyan and Al Mamzar.
Also by Alef Group in Muwaileh: Nama Phase 6, Nama Phase 5, Al Mamsha Hamsa Phase 2, Nama Phase 3, Sawa 1




