Off-plan
Mirdad 4
van Union Properties P.J.S.C in Motor City
Vanaf AED 763,000Betalingsplan 60/40Oplevering Q4 2028
- Vanaf
- AED 763,000
- Oplevering
- Q4 2028
- Woningen
- Studio tot 3 slpk.
- Betalingsplan
- 60/40
Over Mirdad 4
Mirdad 4 marks the completion of Motor City's residential cluster, introducing contemporary apartments to one of Dubai's established family neighbourhoods. The development offers one, two and three-bedroom homes set within a community distinguished by recreational amenities and extensive green spaces.
The project comprises one, two and three-bedroom apartments reflecting contemporary design principles. The residences integrate into a community purposefully built around recreational priorities and family living.
The neighbourhood features a gymnasium, indoor swimming pool, landscaped gardens and children's play areas for recreational pursuits. Retail facilities, restaurants and other conveniences serve the day-to-day needs of residents.
Motor City distinguishes itself through low-rise architecture and purposeful green spaces. The neighbourhood provides pedestrian connectivity to parks and the Dubai Autodrome, preserving a distinct residential character separate from Dubai's denser zones.
Woningen
Betalingsplan
- 60%Tijdens de bouw
- 40%Bij oplevering
Voorzieningen
- Binnenzwembad
- Fitnessruimte
- Speelruimte voor kinderen
- Aangelegde tuinen
- Restaurants en cafés
- Winkels
- Beveiliging, dag en nacht
Bouw en data
- Geplande oplevering
- Q4 2028
Locatie
Over Motor City
Mirdad 4 is een freehold-project.
Masterplan
Mirdad 4 integrates with Motor City's distinctive low-rise character and network of green corridors. The development incorporates landscaped gardens and outdoor recreation areas within the neighbourhood's walkable pedestrian environment.

Vragen over Mirdad 4
- Wat kost Mirdad 4?
Mirdad 4 start vanaf AED 763,000, per 22 september 2026.
- Wat is het betalingsplan van Mirdad 4?
Het betalingsplan van de ontwikkelaar voor Mirdad 4 is 60/40: 60% tijdens de bouw en 40% bij oplevering, per 22 september 2026.
- Wanneer wordt Mirdad 4 opgeleverd?
De oplevering staat gepland voor Q4 2028.




