Off-plan
Mirdad 3
van Union Properties P.J.S.C in Motor City
Vanaf AED 763,000Betalingsplan 60/40Oplevering Q4 2028
- Vanaf
- AED 763,000
- Oplevering
- Q4 2028
- Woningen
- Studio tot 3 slpk.
- Betalingsplan
- 60/40
Over Mirdad 3
Mirdad 3 brings one to three-bedroom apartments to Motor City, a themed community where automotive culture meets residential living. The development combines contemporary design with thoughtfully configured interiors for modern urban dwellers.
The apartments range from studios to spacious three-bedroom units, each planned to maximise light and living flexibility. Interior spaces prioritise open-plan layouts and functional efficiency, reflecting contemporary preferences for adaptable living arrangements.
Motor City is distinguished by its automotive heritage and themed character, with streets named after legendary racing circuits and drivers. The neighbourhood balances this distinctive identity with landscaped parks and family-oriented amenities, creating a sense of place beyond typical residential areas.
The development occupies an established position within Motor City's infrastructure network, benefiting from direct connection to Al Khail Road and proximity to Hessa Street. Residents enjoy access to downtown Dubai within approximately twenty minutes, with convenient proximity to Dubai Marina and the coast.
Woningen
Betalingsplan
- 60%Tijdens de bouw
- 40%Bij oplevering
Voorzieningen
- Binnenzwembad
- Fitnessruimte
- Spa en wellness
- Speelruimte voor kinderen
- Aangelegde tuinen
- Barbecueplaats
- Bioscoopzaal
- Winkels
Bouw en data
- Geplande oplevering
- Q4 2028
Locatie
Over Motor City
Mirdad 3 is een freehold-project.
Masterplan
The project introduces landscaped grounds, swimming facilities, and communal spaces alongside retail and dining options, fostering an environment that encourages community interaction and active living.

Vragen over Mirdad 3
- Wat kost Mirdad 3?
Mirdad 3 start vanaf AED 763,000, per 22 september 2026.
- Wat is het betalingsplan van Mirdad 3?
Het betalingsplan van de ontwikkelaar voor Mirdad 3 is 60/40: 60% tijdens de bouw en 40% bij oplevering, per 22 september 2026.
- Wanneer wordt Mirdad 3 opgeleverd?
De oplevering staat gepland voor Q4 2028.




