Off-plan
Evermore
van Beyond in Al Marjan Island
Vanaf AED 2,150,000Betalingsplan 50/50Oplevering Q4 2029
- Vanaf
- AED 2,150,000
- Oplevering
- Q4 2029
- Woningen
- 1 tot 3 slpk.
- Betalingsplan
- 50/50
Over Evermore
Evermore by Beyond brings one- to three-bedroom apartments to Al Marjan Island in Ras Al Khaimah, with designs emphasising natural light and waterfront views.
The architectural conception prioritises generous spatial proportions and direct connections between interior rooms and external areas. Each residence is positioned to capture natural daylight and frame the surrounding waterfront environment, creating spaces that are both refined and authentic.
Al Marjan Island has established itself as one of the northern emirates' most sought-after waterfront addresses. The man-made archipelago offers residents coastal tranquillity combined with connectivity to Ras Al Khaimah's evolving hospitality and commercial infrastructure.
The development's position provides proximity to recreational facilities, dining venues, and entertainment options. Ras Al Khaimah attracts residents drawn to the emirate's natural assets, stable property market, and forward-looking development trajectory.
De film
Woningen
2 slpk. Appartement
3 slpk. Appartement
Betalingsplan
- 10%Aanbetaling
- 40%Tijdens de bouw
- 50%Bij oplevering
Voorzieningen
- Binnenzwembad
- Fitnessruimte
- Speelruimte voor kinderen
- Aangelegde tuinen
- Restaurants en cafés
- Beveiliging, dag en nacht
Bouw en data
- Geplande oplevering
- Q4 2029
Locatie
Over Al Marjan Island
Evermore is een freehold-project.
Masterplan
Evermore comprises multiple residential structures oriented to capture sea views and natural illumination. Landscaped gardens and recreational amenities create defined community spaces, whilst direct access to beaches permits residents to engage with the natural coastal environment.

Vragen over Evermore
- Wat kost Evermore?
Evermore start vanaf AED 2,150,000, per 24 september 2026.
- Wat is het betalingsplan van Evermore?
Het betalingsplan van de ontwikkelaar voor Evermore is 50/50: 10% aanbetaling, 40% tijdens de bouw en 50% bij oplevering, per 24 september 2026.
- Wanneer wordt Evermore opgeleverd?
De oplevering staat gepland voor Q4 2029.




