Off-plan
Samr
van Alef Group in Hayyan
Vanaf AED 2,389,000Betalingsplan 40/60Oplevering Q4 2028
- Vanaf
- AED 2,389,000
- Oplevering
- Q4 2028
- Woningen
- 3 tot 4 slpk.
- Betalingsplan
- 40/60
Over Samr
Samr is a townhouse community by Alef Group in Hayyan, Sharjah, offering three and four-bedroom residences designed around family living and sustainability.
Hayyan is a thoughtfully planned master community in Sharjah known for balancing serene surroundings with convenient urban access. The neighbourhood appeals to families and individuals who value tranquility alongside connectivity to commercial, educational, and cultural destinations.
The townhouses emphasise practical family living with sustainable design principles. Indoor-outdoor connections and generous layouts support comfortable, everyday living. Swimming pools, gymnasiums, dining facilities, and children's play areas provide complete community infrastructure.
Sharjah City Centre, University City, and Sharjah International Airport are within easy reach. The location suits professionals requiring connectivity to Dubai and makes it ideal for families with school-age children.
Woningen
4 slpk. Townhouse
Betalingsplan
- 5%Aanbetaling
- 35%Tijdens de bouw
- 60%Bij oplevering
Voorzieningen
- Binnenzwembad
- Fitnessruimte
- Speelruimte voor kinderen
- Aangelegde tuinen
- Restaurants en cafés
- Beveiliging, dag en nacht
Bouw en data
- Geplande oplevering
- Q4 2028
Locatie
Over Hayyan
Samr is een freehold-project.
Masterplan
Samr comprises townhouses arranged within Hayyan's master community, surrounded by landscaped gardens and open recreational spaces. Swimming facilities, gymnasiums, dining venues, and children's play areas are distributed throughout, creating a cohesive environment for family living.

Brochure
Vragen over Samr
- Wat kost Samr?
Samr start vanaf AED 2,389,000, per 24 september 2026.
- Wat is het betalingsplan van Samr?
Het betalingsplan van de ontwikkelaar voor Samr is 40/60: 5% aanbetaling, 35% tijdens de bouw en 60% bij oplevering, per 11 oktober 2026.
- Wanneer wordt Samr opgeleverd?
De oplevering staat gepland voor Q4 2028.




