Off-plan
Grid Residence
van Aldar Properties PJSC in Athlon by Aldar
Vanaf AED 1,350,000Betalingsplan 60/40Oplevering Q1 2029
- Vanaf
- AED 1,350,000
- Oplevering
- Q1 2029
- Woningen
- 1 tot 3 slpk.
- Betalingsplan
- 60/40
Over Grid Residence
Grid Residence is a contemporary residential tower within Athlon by Aldar, offering one to three-bedroom apartments designed for modern urban living in Dubai's Dubailand district.
The apartments are conceived with attention to spatial planning and natural light. The architectural approach emphasises openness and circulation, allowing residents to move and live with ease throughout their homes.
The development integrates residential accommodation with an indoor swimming pool, landscaped gardens, gymnasium, restaurants, and children's play areas, supported by security infrastructure. These facilities contribute to a lifestyle that extends beyond the individual apartment.
Athlon by Aldar connects residents to Dubailand's broader community. Educational institutions, healthcare providers, shopping and dining venues, and recreational areas feature throughout the surrounding neighbourhood.
Woningen
2 slpk. Appartement
3 slpk. Appartement
Betalingsplan
- 5%Aanbetaling
- 55%Tijdens de bouw
- 40%Bij oplevering
Voorzieningen
- Binnenzwembad
- Fitnessruimte
- Speelruimte voor kinderen
- Aangelegde tuinen
- Restaurants en cafés
- Beveiliging, dag en nacht
Bouw en data
- Geplande oplevering
- Q1 2029
Locatie
Over Athlon by Aldar
Grid Residence is een freehold-project.
Masterplan
The tower sits within landscaped grounds that provide recreational amenities and shared spaces for residents. The development includes an indoor swimming pool, gymnasium, dining establishments, gardens, and children's play areas.

Brochure
Vragen over Grid Residence
- Wat kost Grid Residence?
Grid Residence start vanaf AED 1,350,000, per 22 september 2026.
- Wat is het betalingsplan van Grid Residence?
Het betalingsplan van de ontwikkelaar voor Grid Residence is 60/40: 5% aanbetaling, 55% tijdens de bouw en 40% bij oplevering, per 11 oktober 2026.
- Wanneer wordt Grid Residence opgeleverd?
De oplevering staat gepland voor Q1 2029.




